Chadron Wastewater Treatment Plant

Baker & Associates worked with the City of Chadron in planning and designing of a new Wastewater Treatment Facility.  The facility replaced an aging lagoon system that was out of compliance with state standards.  The new facility is an activated sludge Aeromod Sequox system with a step bar screen, UV disinfection system, and sludge storage pond.  The facility has full back up power and operational redundancy.  The total cost of the project was $4.1 Million.

Share Tweet Pin it